Results 1 to 3 of 3

Thread: Upgrade from 6.0.10 to V7

  1. #1
    Matrox is offline Intermediate Member
    Join Date
    Sep 2009
    Posts
    23
    Rep Power
    5

    Default Upgrade from 6.0.10 to V7

    I installed Outlook connector 6.0.8 (ZCS 6.0.10) and we will upgrade to ZCS 7.0 this week. Do i have to reinstall the Outlook connector 7.0 for my Outlook 2010 users ?


    Thanks,

  2. #2
    fsiegel is offline Zimbra Employee
    Join Date
    Sep 2006
    Posts
    1,334
    Rep Power
    10

    Default

    You don't have to -- older ZCO works with newer servers. But 7.0 has a lot more features.

  3. #3
    Matrox is offline Intermediate Member
    Join Date
    Sep 2009
    Posts
    23
    Rep Power
    5

    Default

    thanks! I appreciate.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Upgrade from 6.0.10 to 7 beta4
    By alex70 in forum Installation
    Replies: 14
    Last Post: 05-11-2012, 02:02 PM
  2. 6.0.10 to 7.0.0 NetworkEdition Upgrade Problems
    By liston13 in forum Administrators
    Replies: 3
    Last Post: 07-31-2011, 11:41 PM
  3. Upgrade attempt from NE 6.0.10 to NE 7.0.0 hung
    By goo0h in forum Administrators
    Replies: 8
    Last Post: 03-03-2011, 12:16 PM
  4. Replies: 17
    Last Post: 02-11-2011, 03:59 AM
  5. zmsetup.pl hangs in upgrade from 6.0.3 to 6.0.10
    By snorris09 in forum Administrators
    Replies: 0
    Last Post: 12-30-2010, 11:33 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •