Results 1 to 3 of 3

Thread: Double Click on a Calendar date (Monthly View) hangs.

  1. #1
    dandus is offline Member
    Join Date
    Sep 2005
    Posts
    14
    Rep Power
    9

    Default Double Click on a Calendar date (Monthly View) hangs.

    I have not installed Zimbra but have tried to play around with the demo. When I went to the monthly calendar view and double clicked on a date, a new appointment window popped up. Yet I noticed it the background hanged. After I entered the appointment ("OK" or "Cancelled" it), I was faced with a hanged calendar. I have to click on the browser's "back" button to get it to response again. However, when I clicked the "back" button, I was back to the mail screen but it looks like to me that it was thinking I was entering the Zimbra all over again. I checked the calendar afterward and the new appointment was properly added. I tried to do the whole sequence of the above again and again, and it looks like that the above "hang" is repeatable.
    Last edited by dandus; 10-02-2005 at 06:23 PM. Reason: clarify the description

  2. #2
    dandus is offline Member
    Join Date
    Sep 2005
    Posts
    14
    Rep Power
    9

    Default

    Quote Originally Posted by dandus
    I have not installed Zimbra but have tried to play around with the demo. When I went to the monthly calendar view and double clicked on a date, a new appointment window popped up. Yet I noticed it the background hanged. Of course, after I entered the appointment (or cancelled it). I was faced with a hanged calendar. I have to click on the "back" button to get it response again and when I clicked the "back" button, I was back to the mail screen. The whole scenario is repeatable.
    I tried the double-clicking in "day view". A new appointment window popped up. The whole calendar did not freeze up though after I "OK" the new appointment.

  3. #3
    KevinH's Avatar
    KevinH is offline Expert Member
    Join Date
    Aug 2005
    Location
    San Mateo, CA
    Posts
    4,789
    Rep Power
    18

    Default

    Thanks. I just tried this on our latest code and it seems fixed. Please try this again once we release another build or update the demo system.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 3
    Last Post: 05-08-2009, 08:26 AM
  2. Zimbra fails after working for 2 weeks
    By Linsys in forum Administrators
    Replies: 10
    Last Post: 10-07-2008, 12:42 AM
  3. need advice on configuring zimbra to work with fax server
    By pheonix1t in forum Administrators
    Replies: 0
    Last Post: 07-11-2007, 07:46 PM
  4. Printing Date Range in month view
    By Joshefson in forum Developers
    Replies: 1
    Last Post: 06-16-2006, 05:55 PM
  5. M2 Experiences?
    By jordandeamattson in forum Users
    Replies: 17
    Last Post: 11-22-2005, 03:32 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •