The old system is a Poweredge, running sbs 2003 w/ a failing mobo (swollen cap problem, I think). The drives (RAID-1) are intact.

The new system is a ThinkServer running Lucid LTS (server) w/ ZCS 7.0 installed.

I can't keep the old system running long enough to complete the migration. So my question is:

Is there any way to transfer/migrate the data from the old drives to ZCS?