Zimbra offers Open Source email server software and shared calendar for Linux and the Mac
Go Back   Zimbra :: Forums > Zimbra Collaboration Suite > Installation

Welcome to the Zimbra :: Forums!
Welcome, if you would like to post a comment please register. We also encourage you to explore all things Zimbra with our team and members of the community.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 08-25-2008, 04:58 PM
Trained Alumni
 
Posts: 108
Default [SOLVED] Upgrade Path Suggested - Starting From 5.0.6 FOSS to 5.0.9 NE

Hello,

We have a 20 node setup on 5.0.6 FOSS that we need to migrate to NE 5.0.9.

Are setup includes:

[2] LDAP Servers with 1 virtual IP (managed by heartbeat) - this virtual is what is the registered ldap url (ie: zldap.example.org). The 2nd LDAP server is basically a replica that can be converted to master with heartbeat scripts.


[2] Mail store servers with 1 virtual IP and connected SAN (maintained by heartbeat) - this virtual IP is also the registered server name (ie: zwebmail.example.org). The 2nd mailstore is offline and used in case of hardware emergency from the primary.

[2] MTA Relay Servers each having their own Zimbra server identity, and a virtual IP for DNS names to point to (ie: zsmtp.example.org)

[14] MTA MX Servers each registered in Zimbra as zMX[01-14].example.org)

The Mail Store Primary, MTA Relays, and MTA MX Servers, all use a local LDAP Replica.


Our Goal (Simply Put) is to run 5.0.9 NE.

I see two different paths we could take

Option 1:
Upgrade 5.0.6 FOSS to 5.0.6 NE, then upgrade 5.0.6 NE to 5.0.9 NE


Option 2:
Upgrade 5.0.6 FOSS to 5.0.9 FOSS, then Upgrade to 5.0.9 NE


The sequence of upgrades is basically DB(LDAP), Mail-Store, MTA's

Thanks again!
Reply With Quote
  #2 (permalink)  
Old 08-25-2008, 08:37 PM
Moderator
 
Posts: 6,236
Default

Don't forget a backup.

If I had to pick probably option 2 instead of option 1 (simply to avoid any fixed issues in the 5.0.6 install script). (You could technically could do it in one sitting (5.0.9 & NE changeover), but splitting it up does have certain advantages in troubleshooting any issues.)

This also doesn't matter as you plan to do it in one sitting (& I don't know if you're doing it that way on purpose - or you may be totally blocking pt 25 anyways and just want the stores up soon so people can interact with them) but we recently changed the preferred order to LDAP (master then replicas) > MTA (mainly to get them accepting mail right away so they can queue mail until the mailstores are up, plus mailstores are capable of being staggered) Dedicated Proxies > Mailstore > Or proxies here depending on their importance to you.
files.zimbra.com/website/docs/Zimbra NE Release Notes.pdf
Rolling Upgrades for ZCS - Zimbra :: Wiki
Reply With Quote
  #3 (permalink)  
Old 08-25-2008, 10:40 PM
Trained Alumni
 
Posts: 108
Default

Great, thanks Mike!
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads

Why Join?

Registering let's you ask questions, makes it easier to search, displays any files attached to posts, and notifies you about replies.

blog.zimbra.com




 

SEO by vBSEO ©2011, Crawlability, Inc.