Zimbra offers Open Source email server software and shared calendar for Linux and the Mac
Go Back   Zimbra :: Forums > Zimbra Collaboration Suite > ZCS Client Connectors > CalDAV / CardDAV / iSync

Welcome to the Zimbra :: Forums!
Welcome, if you would like to post a comment please register. We also encourage you to explore all things Zimbra with our team and members of the community.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 07-01-2008, 02:47 AM
Senior Member
 
Posts: 59
Default iCal broken in 5.0.6?

I've recently upgraded a customer's server to 5.0.6 and it seems the upgrade (from 5.0.4) broke iCal usage: existing calendars still work, but subscribing to new ones (using CalDav) doesn't work. I've created a bug report here: Bug 29568 – iCal support with multiple domains completely broken in 5.0.6

Anyone seeing the same thing? Any things I could try (besides downgrading)?

Frank
Reply With Quote
  #2 (permalink)  
Old 07-01-2008, 09:34 AM
Former Zimbran
 
Posts: 5,606
Default

First off, a couple of notes.

1) We've seen this before. We are members of CalConnect, which is the standards setting advisement body for calendaring protocols. We also work closely with Apple, and have had confirmation that the behavior you're seeing is an iCal issue.
2) Bug hijacking isn't allowed. If you search the forums, you'll see others who will have the same issue as you.
3) Bugzilla isn't for troubleshooting. It's for bugs. I've determined that yours is not a bug.

Now to the issue.

What version iCal are you using? Have you tried lightening or Mulberry? Also, is this 10.5.4 or 10.0.3?

Next, please provide a screenshot of your config.
Reply With Quote
  #3 (permalink)  
Old 07-01-2008, 09:45 AM
Senior Member
 
Posts: 59
Default

1) I do consider it a bug if a perfectly working setup stops working after upgrading to 5.0.6 on 1 server, and still perfectly works on another.

2) I noticed the other bugs, and determined this is not the same one (you can't seem to believe I do leave out the /, you can't seem to believe this isn't my first ical setup, you can't seem to believe it still works on other servers I manage)

I am using latest iCal. I was on 10.5.3 until this morning, and upgraded to 10.5.4. Issue appears on both versions.

When trying Mulberry I get "Method PROPFIND is not defined in RFC 2068 and is not supported by the Servlet API"
Reply With Quote
  #4 (permalink)  
Old 07-01-2008, 09:47 AM
Former Zimbran
 
Posts: 5,606
Default

Can you please provide the screenshot? Our hosted demo Zimbra Collaboration Suite Log In is running 5.0.6 and it works fine.
Reply With Quote
  #5 (permalink)  
Old 07-01-2008, 09:48 AM
Former Zimbran
 
Posts: 5,606
Default

Quote:
Originally Posted by frankske View Post
1) I do consider it a bug if a perfectly working setup stops working after upgrading to 5.0.6 on 1 server, and still perfectly works on another.
We put in a work around to fix the iCal bug in earlier editions of Zimbra. That's why it did, but doesn't work.
Reply With Quote
  #6 (permalink)  
Old 07-01-2008, 09:49 AM
Former Zimbran
 
Posts: 5,606
Default

Quote:
Originally Posted by frankske View Post
When trying Mulberry I get "Method PROPFIND is not defined in RFC 2068 and is not supported by the Servlet API"
Did you follow the setup instructions?
CalDav and Mulberry - Zimbra :: Wiki
Reply With Quote
  #7 (permalink)  
Old 07-01-2008, 10:01 AM
Former Zimbran
 
Posts: 5,606
Default

Also, can you give exact step by step instructions? If Valid and reproducible, I'll reopen.
Reply With Quote
  #8 (permalink)  
Old 07-01-2008, 10:03 AM
Senior Member
 
Posts: 59
Default

Settings: http://dl.getdropbox.com/u/20810/Picture%207.png (notice the missing / at the end)

http://dl.getdropbox.com/u/20810/Picture%208.png (error I get as soon as I hit add on the previous dialog box)

Mulberry now doesn't give an error, but doesn't show the calendars either. I've configured Mulberry to connect to my 5.0.4 server, and it then shows the folders on that account (not only the calendars, but I assume that's normal?)
Reply With Quote
  #9 (permalink)  
Old 07-01-2008, 10:12 AM
Former Zimbran
 
Posts: 5,606
Default

Can you provide the http trace from that?
Reply With Quote
  #10 (permalink)  
Old 07-01-2008, 10:22 AM
Former Zimbran
 
Posts: 5,606
Default

Quote:
Originally Posted by frankske View Post
Settings: http://dl.getdropbox.com/u/20810/Picture%207.png (notice the missing / at the end)

http://dl.getdropbox.com/u/20810/Picture%208.png (error I get as soon as I hit add on the previous dialog box)

Mulberry now doesn't give an error, but doesn't show the calendars either. I've configured Mulberry to connect to my 5.0.4 server, and it then shows the folders on that account (not only the calendars, but I assume that's normal?)
Yeah, it's normal. CalDav is built on the webdav spec.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads

Why Join?

Registering let's you ask questions, makes it easier to search, displays any files attached to posts, and notifies you about replies.

blog.zimbra.com




 

SEO by vBSEO ©2011, Crawlability, Inc.