Quote:
Originally Posted by liverpoolfcfan Wasn't sure if there would be any "baggage" brought over that might cause unexpected problems down the line. |
That shouldn't really be a problem with the exception of the IM server, it's being removed from Zimbra in the next major release. If you have it enabled in 6.x then it will be enabled during an upgrade to 7.x. I'd suggest you disable it on the new server if it's not in use.
Quote:
Originally Posted by liverpoolfcfan Steps to do it your way ...
1. Install 6.0.10 (I'm currently using)
2. Copy /opt/zimbra from old server to new
3. Run upgrade install to 6.0.10 with -s option ???
4. Test
5. Run upgrade to 7.0.x
Is that correct ? |
Yes, that's correct but I'd add of a step 2a) run zmfixperms to make sure everything is OK.
Quote:
Originally Posted by liverpoolfcfan Am I correct in assuming doing it this way, I would have to assign the same hostname and IP Address to the replacement machine as my server currently has ? So after copying over the /opt/zimbra, I would have to remove the old server from the network, and reconfigure the network settings of the new server before starting up zimbra ? |
Yes, that's also correct. I'd recommend keeping the same IP address to save any unforeseen problems (it does happen occasionally) and also the DNS records need to be pointed to the new server.
Is this going to be a migration for a live server or just a test?