Zimbra offers Open Source email server software and shared calendar for Linux and the Mac
Go Back   Zimbra :: Forums > Zimbra Collaboration Suite > Administrators

Welcome to the Zimbra :: Forums!
Welcome, if you would like to post a comment please register. We also encourage you to explore all things Zimbra with our team and members of the community.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 08-26-2010, 02:54 AM
Starter Member
 
Posts: 2
Default need to update ZCO and ZCS at the same time?

Hello

I´m about to upgrade my ZCS from 6.0.5 to 6.0.8.

Do I need to upgrade the ZCO in my outlookclients to?

Does this need to be done att the exaclty the same time or what happens if i dont?

Best Regards
Daniel
Reply With Quote
  #2 (permalink)  
Old 08-26-2010, 03:38 AM
Zimbra Consultant & Moderator
 
Posts: 20,313
Default

Quote:
Originally Posted by Daniel-San View Post
Hello

I´m about to upgrade my ZCS from 6.0.5 to 6.0.8.

Do I need to upgrade the ZCO in my outlookclients to?
You should.

Quote:
Originally Posted by Daniel-San View Post
Does this need to be done att the exaclty the same time or what happens if i dont?
No, you don't have to do it at exactly the same time but I'd suggest as soon as practicably possible after the upgrade (and after you've tested it on a few select users ). The version are close so you should not have any problem but please check the Release Notes and the Product Portal for any relevant bugs or 'gotchas'.
__________________
Regards


Bill
Reply With Quote
  #3 (permalink)  
Old 08-26-2011, 04:36 AM
Special Member
 
Posts: 137
Default

Sorry to dig up an old thread but I think this information would be best kept in the same place so ...

How about when moving Zimbra versions rather than point releases eg 6 - 7 ?

We're going to move to 7 soon and I'm wondering how much extra work it'll involve.
Reply With Quote
  #4 (permalink)  
Old 08-26-2011, 04:42 AM
Zimbra Consultant & Moderator
 
Posts: 20,313
Default

Quote:
Originally Posted by dik23 View Post
Sorry to dig up an old thread but I think this information would be best kept in the same place so ...

How about when moving Zimbra versions rather than point releases eg 6 - 7 ?

We're going to move to 7 soon and I'm wondering how much extra work it'll involve.
That would depend on the version and what it says in the Release Notes. The current ZCO 7.1.2 requires it to be connected to a ZCS 7.1.2 server for some specific bug fixes but there should be no reason that I know of (check the Release Notes) why your current ZCO would not connect to a ZCS 7.1.2 server.
__________________
Regards


Bill
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads

Why Join?

Registering let's you ask questions, makes it easier to search, displays any files attached to posts, and notifies you about replies.

blog.zimbra.com




 

SEO by vBSEO ©2011, Crawlability, Inc.