    Hello!
    We upgraded to Zimbra 6.04 over the weekend. Now we are having problems with our calendar system.

    We have 1 account that we created a global calendar through. We created a link on our website to the calendar (we got this link from the share calendar dialog box)

    when you look at the calendar in any zimbra web client, the calendar appears normal. By normal i mean that all day events only span 1 day.

    If you follow the link provided by the share calendar dialog box; it shows that the all day events span 2 days.

    Here is the link that the share dialog box shows for allowing external users to view the calendar.

    School Calendar: December 2009

    What do i do to fix this BESIDES going through and changing each and every all day event to a static time frame, like 9am to 5pm. That wouldn't really work for us.

  2. #2
    PRL
    PRL is offline Intermediate Member
    Join Date
    Oct 2008
    Location
    Alberta
    Posts
    19
    Rep Power
    6

    Default

    I am also experiencing a similar problem. We have a number of shared calendars that our staff use to create various task schedules. Our employees like to print these schedules for the entire month so they know what tasks have been assigned to them. Everything appears to look fine when they view the shared calendars, however when they into the print preview, the "All day events" carry over to the next day.

    I can't confirm this, however my users believe that this problem started happening after the upgrade from 6.0.3 to 6.0.4.

    One more thing to add, I thought I would try logging into Zimbra using the HTML client to see what happens and the problem still occurs. It is actually worse as this problem is not only happening in the print preview, but also in the regular calendar view.
    Last edited by PRL; 12-23-2009 at 09:10 AM.

  3. #3
    gettyless is offline Loyal Member
    Join Date
    Mar 2007
    Posts
    95
    Rep Power
    8

    Default

    Just curious, which version of zimbra did you upgrade from?

  4. #4
    vward is offline Member
    Join Date
    May 2009
    Posts
    13
    Rep Power
    5

    Default

    we have version 6.04. We upgraded from 5.018. We have yet to find a solution.

  5. #5
    gantscha is offline Senior Member
    Join Date
    Jul 2008
    Location
    Austria
    Posts
    54
    Rep Power
    6

    Angry

    I can confirm this Problem! Even with timezones set correctly...

    In our case the calender looks right but if we press print button the all day events span over two days!

    I think it is a bug with the timezone so that the events move one hour and span over two days...

    we are also on 6.0.4 (directly upgraded from 5.0.18)

  6. #6
    y@w's Avatar
    y@w
    y@w is offline Moderator
    Join Date
    Jan 2008
    Posts
    658
    Rep Power
    8

    Default

    So, are all these users in the same timezone or different timezones? There's several bugs open about Outlook mangling all day events when crossing timezones.

  7. #7
    robert_pang@sd63.bc.ca is offline Junior Member
    Join Date
    Apr 2009
    Location
    Victoria BC Canada
    Posts
    7
    Rep Power
    6

    Default Same thing

    Upgraded from 5.0.15 to 6.0.3 and all day events extend over 2 days. Need a fix for this

    examples Home: School Calendar
    Home: School Calendar

  8. #8
    robert_pang@sd63.bc.ca is offline Junior Member
    Join Date
    Apr 2009
    Location
    Victoria BC Canada
    Posts
    7
    Rep Power
    6

    Default Helps a little

    Found this and if you set a start time on the day it helps a little but the last item covers from Friday to Saturday

    go into the account and set the account to log in with the standard html client

    Log in as the account and go into preference / calendar

    You can now change the start time for the day.

    Save and return to the advance client.

  9. #9
    gantscha is offline Senior Member
    Join Date
    Jul 2008
    Location
    Austria
    Posts
    54
    Rep Power
    6

    Default

    hm... are you taking about the timezone setting?!? Because a dedicated "Starttime of the Day" option is not available in our zimbra 6.0.4 Installation?!? Or did i miss your point totally?!?

    Is there already a bug report for this?!?

  10. #10
    vward is offline Member
    Join Date
    May 2009
    Posts
    13
    Rep Power
    5

    Default

    I think you have to switch from the advanced web client to the standard client in order for the change start time to become available. At that point you can switch back. This still does not fix the issue totally. In addition, none of our users use outlook, so this problem has nothing to do with outlook for us.

Page 1 of 2 12 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Default all day event free/busy
    By bradley8424 in forum Administrators
    Replies: 0
    Last Post: 05-21-2009, 08:29 AM
  2. Turning OFF All Day Event reminders?
    By Miklos Kalman in forum Zimbra Connector for Outlook
    Replies: 5
    Last Post: 04-16-2008, 07:35 PM
  3. One All Day Event spans over two days!!!
    By Marcelo in forum Zimbra Connector for Outlook
    Replies: 7
    Last Post: 12-12-2006, 12:21 AM
  4. All day calendar appts splitting over 2 days
    By kevindods in forum Zimbra Connector for Outlook
    Replies: 9
    Last Post: 06-19-2006, 04:04 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •