I have a 4.5.6 NE and i have copied the VM in a remote webfarm to have DR.
I have to maintain the 2 server aligned: every night a process (rsync for example) re-aligns the copy in DR with the main Zimbra; which is the best strategy to maintain 2 Zimbra server in sync? or is there something in place that should be used?
I presume that
1. stopping zimbra in main server
2 . rsync /opt/zimbra from main to DR server
3. starting again Zimbra on main server
should be a way to do it.
TIA